The conference Friday was okay. I think that all the groups could have answered the questions that people asked better. My team had H. Husnay go up and talk about where the AOA team is, and what we are planning on doing for Bold. He talked about the touch sensors, and ultra sonic sensors, and how all we really have to do now is progam and attach them to Bold. S. Johnson,AOA
On Friday, we had a press conference. One person from each team was a spokes person. The MFO team talked about what the magnetic sensor looked like. The MFO team also talked about what the magnetic sensor does. All we need to do is finish the programming. Z.Berg, MFO
On Friday, we talked about our updates on our rover. We talked about our role of bieng on the team we are on [VCom,Mfo,etc]. At the end we asked questions on the difficulty, bulding, and exp. ~A.Sholtz
On Friday, we talked about our updates on our rover. We talked about our role of bieng on the team we are on [VCom,MFO,etc]. At the end we asked questions regarding the difficulty, bulding, and exp. ~A.Sholtz, VCom
On Friday, The Steam team had a large press conference. Each group went up and talked about how there individual groups are doing and where they are at. Each group is doing a different way of putting there rover together so, it will be very interesting to see all the rovers go. O. McEachron, VCom
On Fridays Press Conference the AOA team talked about use having two Touch Sensors on the rover. One in the front and one in the back and we taalked about making a second Ultra Sonic Sensor. Our team talked about the rover Bold and presented ideas about the rovers. T. Lindquist, AOA team
On Friday we had a press conference. We had one member of each team on the Bold Rover talk about their status update. The AOA talked about our Touch Sensors and our programming. We said that we have two Touch Sensors one on the front and back. We are still deciding weather to put an Ultra Sonic Sensor on the Rover or not. We really haven't made that much progress on programming only because of the Ultra Sonic Sensor dilema.
On Friday we had a press conference. We talked about the programming going on and how we are going to attach the sensors on. CorNav specifically talked about the double programming for the light sensor. H.McCarthy, CorNav
On Fridays Press Conference the AOA team talked about us having two Touch Sensors on the rover. One in the front and one in the back and we talked about making a second Ultra Sonic Sensor. Our team talked about the rover Bold and presented ideas about the rover. T. Lindquist, AOA team
On Friday, Kyle was a spokes person and she talked about how we needed to finish programming. Then we needed to mount the arm to the side of the rover. We had 7 people from each rover group telling us about where they are in the process. They could have showed us a example of what they did so far.
Last Friday we participated in a press conference that explained the status of our rover. We talked about the idea of the light sensor attachment to the wheel which we finally figured out. We also talked about the two programs for the rover. So far, due to the rover not being functional yet, we have not been able to try out the programs. However the rover has been in more shape each day and I am confident that we will be able to see what the new program is capable of. M. Green, CorNav
On Friday, Kyle was a spokes person and she talked about how we needed to finish programming. Then we needed to mount the arm to the side of the rover. We had 7 people from each rover group telling us about where they are in the process. They could have showed us a example of what they did so far. F.Colosi MFO
As of Friday, the VCom Team has released the news of only using 2 IPod mounts for the rover. For our presentation, we confirmed the news that we are ready for the rover anytime needed. For the placement on the rover one of the iPods will go on the front and one will also go on the back. K.Angona, VCom
On Friday the Bold Rover Team had a press conference and our Rover Team shared our new plans for the Rover, new sensors and how they work and what they will do. Also we shared of what we had on the Rover already, two CPU's and a tempature probe. T.Gardner, AOA
On Friday we had a press conference about our rover so far. Our rover is officially called "Bold". Each group had seven people go up and present about their rover. We told the audience about our current status of our rover. We recently found out our capsule might be too small so we are trying to think of solution. J.Bousquet, EDL
During the press confrence on Friday, one person from each team went up into a panel and talked abut how far we are into building BOLD. Our group talked about how we had two programs, how the light sensor will look, and how we will stabilize the sensor. -E.Peterson, CorNav
On Friday, the Press Conference, we were cofirmed that our Rover's name was "Bold." Then our represetive, Jack, stated our position on the capsule. We have the outer shell made, and now we are making the parachute and heat shield. Then the other groups stated their progress. Generally "Bolds" progress is doing ok, but not as good as the other groups. The other Rovers are have a more complete Idep, but we have a more complete EDL. We need to finish programing and building the arms to catch up to the others, and we are almost finished with both. P. Corbett EDL Tech signing off.
On Friday we had a press conference. We had one member of each team on the Bold Rover talk about their status update. The AOA talked about our Touch Sensors and our programming. We said that we have two Touch Sensors one on the front and back. We are still deciding weather to put an Ultra Sonic Sensor on the Rover or not. We really haven't made that much progress on programming only because of the Ultra Sonic Sensor dilema. H. Husnay, AOA Programmer
We reported that we have officially built and named our rover, Bold. On Friday, the Rover Bold team met up and did a live broadcast. I discussed our robotic temperature probe arm. I did a demonstration with the arm dipping and coming back up. I also discussed how the program works. M.Sicilia,IDep
On Friday at the press conference one member of each team talked about their update. VCom's status is that we have various iPod mounts built and we are currently working on attatching them to the rover. -VCom K. Burgess
On Friday, we had a press conference with the other teams and asked questions about their achievements. Our team reported that we officaly built and named our Rover, Bold, but the fragments of the rover still need to be mounted them in the right place. We need to put our temprature probe on the front so when it gets to its destination then it will do its job and measure the temprature of the liquid that is at the end. M. Hamilton, IDEP
On Friday during the press conference we learned the Rover’s name, "Bold". Everyone talked about their status update for the rover. The EDL team talked about how they are working on the heat shield and their idea for how they will make it. K. Laviola, EDL
On Friday our group decided on the rover name to be Bold then, at the press confrence one member of each team (EDL, MFO, CorNav, IDep, and VCom and the project mannager) went up ant spoke to the audience. The speaker of our group talked about the temperature probe design. D. Carlson, IDep
On Friday, the rover name was chosen. Also, one person from each team went up to speak to the audience about the staus of their job with the rover. K. Hermandez, MFO
The conference Friday was okay. I think that all the groups could have answered the questions that people asked better. My team had H. Husnay go up and talk about where the AOA team is, and what we are planning on doing for Bold. He talked about the touch sensors, and ultra sonic sensors, and how all we really have to do now is progam and attach them to Bold.
ReplyDeleteS. Johnson,AOA
On Friday, we had a press conference. One person from each team was a spokes person. The MFO team talked about what the magnetic sensor looked like. The MFO team also talked about what the magnetic sensor does. All we need to do is finish the programming.
ReplyDeleteZ.Berg, MFO
On Friday, we talked about our updates on our rover. We talked about our role of bieng on the team we are on [VCom,Mfo,etc]. At the end we asked questions on the difficulty, bulding, and exp.
ReplyDelete~A.Sholtz
On Friday, we talked about our updates on our rover. We talked about our role of bieng on the team we are on [VCom,MFO,etc]. At the end we asked questions regarding the difficulty, bulding, and exp.
Delete~A.Sholtz, VCom
On Friday, The Steam team had a large press conference. Each group went up and talked about how there individual groups are doing and where they are at. Each group is doing a different way of putting there rover together so, it will be very interesting to see all the rovers go.
ReplyDeleteO. McEachron, VCom
On Fridays Press Conference the AOA team talked about use having two Touch Sensors on the rover. One in the front and one in the back and we taalked about making a second Ultra Sonic Sensor. Our team talked about the rover Bold and presented ideas about the rovers.
ReplyDeleteT. Lindquist, AOA team
On Friday we had a press conference. We had one member of each team on the Bold Rover talk about their status update. The AOA talked about our Touch Sensors and our programming. We said that we have two Touch Sensors one on the front and back. We are still deciding weather to put an Ultra Sonic Sensor on the Rover or not. We really haven't made that much progress on programming only because of the Ultra Sonic Sensor dilema.
ReplyDeleteOn Friday we had a press conference. We talked about the programming going on and how we are going to attach the sensors on. CorNav specifically talked about the double programming for the light sensor. H.McCarthy, CorNav
ReplyDeleteOn Fridays Press Conference the AOA team talked about us having two Touch Sensors on the rover. One in the front and one in the back and we talked about making a second Ultra Sonic Sensor. Our team talked about the rover Bold and presented ideas about the rover.
ReplyDeleteT. Lindquist, AOA team
On Friday, Kyle was a spokes person and she talked about how we needed to finish programming. Then we needed to mount the arm to the side of the rover. We had 7 people from each rover group telling us about where they are in the process. They could have showed us a example of what they did so far.
ReplyDeleteLast Friday we participated in a press conference that explained the status of our rover. We talked about the idea of the light sensor attachment to the wheel which we finally figured out. We also talked about the two programs for the rover. So far, due to the rover not being functional yet, we have not been able to try out the programs. However the rover has been in more shape each day and I am confident that we will be able to see what the new program is capable of.
ReplyDeleteM. Green, CorNav
On Friday, Kyle was a spokes person and she talked about how we needed to finish programming. Then we needed to mount the arm to the side of the rover. We had 7 people from each rover group telling us about where they are in the process. They could have showed us a example of what they did so far. F.Colosi MFO
ReplyDeleteAs of Friday, the VCom Team has released the news of only using 2 IPod mounts for the rover. For our presentation, we confirmed the news that we are ready for the rover anytime needed. For the placement on the rover one of the iPods will go on the front and one will also go on the back.
ReplyDeleteK.Angona, VCom
On Friday the Bold Rover Team had a press conference and our Rover Team shared our new plans for the Rover, new sensors and how they work and what they will do. Also we shared of what we had on the Rover already, two CPU's and a tempature probe.
ReplyDeleteT.Gardner, AOA
On Friday we had a press conference about our rover so far. Our rover is officially called "Bold". Each group had seven people go up and present about their rover. We told the audience about our current status of our rover. We recently found out our capsule might be too small so we are trying to think of solution.
ReplyDeleteJ.Bousquet, EDL
During the press confrence on Friday, one person from each team went up into a panel and talked abut how far we are into building BOLD. Our group talked about how we had two programs, how the light sensor will look, and how we will stabilize the sensor. -E.Peterson, CorNav
ReplyDeleteOn Friday, the Press Conference, we were cofirmed that our Rover's name was "Bold." Then our represetive, Jack, stated our position on the capsule. We have the outer shell made, and now we are making the parachute and heat shield. Then the other groups stated their progress. Generally "Bolds" progress is doing ok, but not as good as the other groups. The other Rovers are have a more complete Idep, but we have a more complete EDL. We need to finish programing and building the arms to catch up to the others, and we are almost finished with both. P. Corbett EDL Tech signing off.
ReplyDeleteOn Friday we had a press conference. We had one member of each team on the Bold Rover talk about their status update. The AOA talked about our Touch Sensors and our programming. We said that we have two Touch Sensors one on the front and back. We are still deciding weather to put an Ultra Sonic Sensor on the Rover or not. We really haven't made that much progress on programming only because of the Ultra Sonic Sensor dilema.
ReplyDeleteH. Husnay, AOA Programmer
We reported that we have officially built and named our rover, Bold. On Friday, the Rover Bold team met up and did a live broadcast. I discussed our robotic temperature probe arm. I did a demonstration with the arm dipping and coming back up. I also discussed how the program works.
ReplyDeleteM.Sicilia,IDep
On Friday at the press conference one member of each team talked about their update. VCom's status is that we have various iPod mounts built and we are currently working on attatching them to the rover.
ReplyDelete-VCom K. Burgess
On Friday, we had a press conference with the other teams and asked questions about their achievements. Our team reported that we officaly built and named our Rover, Bold, but the fragments of the rover still need to be mounted them in the right place. We need to put our temprature probe on the front so when it gets to its destination then it will do its job and measure the temprature of the liquid that is at the end.
ReplyDeleteM. Hamilton, IDEP
On Friday during the press conference we learned the Rover’s name, "Bold". Everyone talked about their status update for the rover. The EDL team talked about how they are working on the heat shield and their idea for how they will make it. K. Laviola, EDL
ReplyDeleteOn Friday our group decided on the rover name to be Bold then, at the press confrence one member of each team (EDL, MFO, CorNav, IDep, and VCom and the project mannager) went up ant spoke to the audience. The speaker of our group talked about the temperature probe design.
ReplyDeleteD. Carlson, IDep
On Friday, the rover name was chosen. Also, one person from each team went up to speak to the audience about the staus of their job with the rover.
ReplyDeleteK. Hermandez, MFO